Construction of ETAP prepared to treat 23 l / s and consisting of two closed filters flint type vertical cylinder of 2,500 mm diameter and base load filtering sand of different sizes. The second compartment of the building housing the dossificacions hypochlorite, coagulant and flocculant.

Once treated water is discharged into the new circular tank 1,000 m3 Linya, in the municipality of Navés.

Work done by the Catalan Water Agency