Dear collaborators, As you well know, we are living an extraordinary situation. The country is in a state of emergency and health crisis due to the extension of COVIDIEN-19. In order to avoid the collapse of hospitals, a regime of generalised confinement and state of...
The rehabilitation work of the building of Ca l’Alier carried out by Calaf Constructora and the UTE VOPI4-Elecnor won the Catalunya Construcció award in the category of heritage rehabilitation. Calaf Constructora will be responsible for the construction of the...
On Friday, June 21, the widening of the platform of the FGC Provença station in the direction of Sarrià took place. The inauguration ceremony was chaired by the President of the Generalitat de Catalunya, Quim Torra, and the Minister of Territory, Damià Calvet, and the...
On April 26, a group of Master’s students from Peru to the UPC visited the Santcugatenca rehabilitation project. The rehabilitation of the Santcugatenca has been carried out following the methodology LEAN with Last Planner System (LPS). The visit was held by...
From 11 June the use of BIM will be compulsory in all civil works and building competitions of the Generalitat de Catalunya with an import of more than 5.5 million euros, so the Secretary General of Territory and Sustainability, Ferran Falcó, has announced during the...